Bathroom renovation, waterproofed first.

Edmonton bathrooms with drainage and ventilation done before tile.

The order of work

What happens before the tile goes on

  • Services roughed in by ticketed trades
  • Blocking for grab bars and heavy vanities
  • Waterproofing as one continuous system
  • Inspection before anything is closed in
Plumbing and electrical rough-in inside open walls

Scope

Bathroom projects we do

01

Full rebuild

Back to the studs, for water damage or a bad layout.

02

Refresh

Vanity, toilet, lighting and paint; tile left alone.

03

Tub-to-shower

Drain, slope and curb set before any tile.

04

Basement bathroom

Drainage tied in below the slab, or pumped.

05

Accessibility

Grab-bar blocking, curbless showers, wider doors.

06

Ventilation

A fan ducted outside, on a short sealed run.

Before you commit

A refresh may be enough

If the tile, floor and layout are sound, we quote a refresh instead of a rebuild.

A tired white-tiled bathroom with a pedestal sink and tub

FAQ

Bathroom questions

What drives the cost of a bathroom renovation?

Whether fixtures move, how much area is waterproofed and tiled, and the fixtures and vanity you choose.

Why does waterproofing cost more than the tile?

Tile is a surface; the membrane behind it decides whether the room lasts.

Can we use the bathroom during the work?

Not that one, and if it is your only bathroom, the toilet and shower come back first.

Is a permit needed?

Not for a like-for-like refit, but moving drains usually does, and we handle it.

What about mould we find once it is open?

We show you and price it before continuing.

Refresh or rebuild?

Send photos and we will tell you.