Layout & cabinetry
Cabinets ordered from a measured drawing.

Edmonton kitchens with cabinets ordered before anything is torn out.
Sequence
Cabinets are ordered before demolition is booked, so the room is out of use for less time.

Scope
Cabinets ordered from a measured drawing.
Templated once the boxes are set and level.
Appliance circuits, outlets and task lighting.
Supply, drains, and a hood vented outside.
Decided with the layout, not after it.
A load-bearing wall gets a designed beam first.
The regulated part
Circuits, drains and hood venting go to ticketed trades on permit, inspected before the walls close.

Process
Two or three layouts to compare.
Everything chosen, priced and written down.
Demolition is dated from the delivery date.
Trades move services; inspected before closing.
Cabinets, counters, trim and appliances.
FAQ
Whether the layout moves, since moving plumbing, gas or venting adds trades, then the cabinets and counters you choose.
Only for the install, because we order before we demolish.
If the boxes are sound and the layout works, new doors and counters are enough.
Not for a like-for-like refit, but moving plumbing or a wall usually does, and we handle it.
Yes, with model numbers before cabinets are ordered.